The brief.
The project involved the supply and construction of a 40' x 80' pre-engineered metal building erected upon a concrete mansonry unit to provide dedicated storage for equipment, topsoil, and salt. The owner needed a durable, low-maintenance facility capable of protecting valuable equipment and materials from the elements while improving site organization and operational efficiency. The building was designed to accommodate the unique storage requirements of bulk materials and heavy equipment, providing ample space for loading, unloading, and day-to-day operations in a demanding work environment
The outcome.
The completed 40' x 80' PEMB delivered a reliable and versatile storage solution tailored to the owner's operational needs. The facility provides secure, weather-protected storage for equipment, topsoil, and salt, helping preserve material quality and reduce exposure-related maintenance concerns. The spacious interior layout allows for efficient material handling and equipment access, improving workflow and site organization. The finished building offers a durable, long-lasting asset that enhances operational efficiency while providing dependable storage for years to come.




